The team have successfully finished the SRR on 23 June, 2016 which have included the following deliverables:
1.Requirements Development Process
2.Mission goals
- Education
- Camera
- Battery
3.Concept Of Operation
4.Systems Engineering
- System architecture
- States/Modes concept
- Components selection criteria
- Configuration management concept
5.High Level Requirement (updated based on the comments gathered from the MCR)
6.Subsystem Requirements
- General
- Mechanical
- OBC, Software
- EPS
- Comm; Licensing
- Payload and ACS
- Test requirements
- Risks identification