Successful SRR :)

The team have successfully finished the SRR on 23 June, 2016 which have included the following deliverables:

1.Requirements Development Process

2.Mission goals

  • Education
  • Camera
  • Battery

3.Concept Of Operation

4.Systems Engineering

  • System architecture
  • States/Modes concept
  • Components selection criteria
  • Configuration management concept

5.High Level Requirement (updated based on the comments gathered from the MCR)

6.Subsystem Requirements

  • General
  • Mechanical
  • OBC, Software
  • EPS
  • Comm; Licensing
  • Payload and ACS
  • Test requirements
  1. Risks identification

 